Inception Date: August 2006
Completion Date: May 2008
Contract Amount: $7,310,716
Construction Type:
CM / GC - Negotiated

Project Contacts

Owner:

Lima Memorial Hospital
Contact: Todd Numbers, 419-228-3335

Architect:

NBBJ
Columbus, OH
Contact: Eric Blackburn, 614-224-7147

General Contractor:

Tuttle Construction, Inc.
Project Manager: Steve Schroeder
Site Superintendent: Rick Stuber

Surgery Addition & Renovations

Project Scope

Tuttle Construction coordinated the entire project, created all estimates and budgets, created and updated project schedules, and managed every aspect of the project. Tuttle was responsible for subcontractors and vendor coordination, coordination of architectural and engineering timelines, as well as owner input when required. Tuttle self-performed concrete and carpentry work while performing all construction manager responsibilities.

Additional details about the project include: clearing and grubbing - demolition of old ER entrance, structure above/below was removed in it's entirety, approx. 6,000 SF of asphalt and stone base was removed, approx. 4,000 SF of landscaping (grass and shrubs) were removed, roof structure of approximately 50'x50' (made of concrete) was removed, basement area below drive (approximately 100' x 50' x 15' deep) was removed, and approximately 500' LF of existing sewer was removed and relocated with new sanitary/ storm, catchbasins/ manholes. Incidental Grading - after demolition grading of area after utility relocations in preparation of foundations for new addition. Area covered approximately 240' x 100' = 24,000 SF. Retaining Wall - new concrete retaining wall constructed at south end approx. 200' long by 9' tall x 12" thick.