Shawnee Alliance Church

Project Details

Inception Date:  July 2009
Completion Date:  January 2010
Contract Amount:  $2,381,000
Construction Type:
General Contractor, Negotiated

Project Contacts

Owner:

Shawnee Alliance Church
4455 Shawnee Road, Lima, OH 45806
Contact: Pastor Daniel Messner, (419) 991-6546

Architect:

Rooney Clinger Murray Archt.
Findlay, OH
Contact: Jerry Murray, (419) 424-9790

General Contractor:

Tuttle Construction, Inc.
Project Manager: Mike Baxter
Site Superintendent: Chris Winter

New Activity Center, Lima, Ohio

Project Scope

Tuttle Construction is the General Contractor for this 14,700 SF Activity Center with an attached 4,000 SF Front Entry. Tuttle's responsibilities included overall project and schedule coordination, which all began with multiple budget pricing and estimates. Tuttle was responsible for subcontractors and vendor coordination, coordination of architectural and engineering timelines, as well as owner input when required. Tuttle self-performed concrete, carpentry work, and installation of the pre-manufactured metal building, while performing all construction manager responsibilities.